How to Write an RFQ for Custom Metal Fabrication (Checklist)

How to write an RFQ for custom metal fabrication

Short answer: A good RFQ for custom metal fabrication gives the factory everything it needs to price the part without guessing: a dimensioned 2D PDF and a 3D STEP file, material grade and thickness, a tolerance standard, finish and RAL color, quantities and annual volume, packaging and labeling, the Incoterms rule and named place, inspection and sample requirements, and your timeline. Use the checklist table below and send it with your drawings so every supplier quotes the same thing.

1. Drawings and files

Send two files for every part or assembly:

  • 2D PDF drawing: all dimensions, tolerances, material, thickness, finish, revision letter and date in the title block. This is the document the factory inspects against.
  • 3D model in STEP format: STEP (ISO 10303) is a neutral standard for exchanging product data between different CAD systems, so the factory can open it whatever software you use. It speeds up flat-pattern development for sheet metal and checks for fit.

DXF files help for laser-cut flat parts. If you only have a sketch, a photo or a physical sample, that is still a valid starting point. Our CAD design service works from sketches, samples and reference photos and handles DWG, DXF, STEP and PDF.

2. Material, thickness and tolerances

Name the material by grade and standard (for example a specific carbon steel grade, galvanized coil, or 304 or 316 stainless), not just “steel”. State thickness for every sheet part and outside size and wall thickness for every tube.

For tolerances, the simplest approach is a general tolerance note plus individual tolerances only on dimensions that matter for fit or function. ISO 2768-1 sets general tolerances for linear and angular dimensions without individual tolerance marks, for parts made by metal removal or formed from sheet metal. It has four classes:

ISO 2768-1 class Over 30 to 120 mm Over 120 to 400 mm Over 400 to 1000 mm
f (fine) ±0.15 mm ±0.2 mm ±0.3 mm
m (medium) ±0.3 mm ±0.5 mm ±0.8 mm
c (coarse) ±0.8 mm ±1.2 mm ±2 mm
v (very coarse) ±1.5 mm ±2.5 mm ±4 mm

Write the class in or near the title block, for example “ISO 2768-m”. Avoid the old “mK” style unless you have a reason: the uppercase letter refers to ISO 2768-2, which has been withdrawn and replaced by ISO 22081:2021. For welded frames and assemblies, ISO 13920 gives general tolerances for welded constructions in four classes, so name a class there too. Tighter classes cost more, so use them only where needed.

Measuring a part during sample inspection
Measuring a part during sample inspection.

3. Finish, color and marking

  • Finish type: powder coat, galvanizing, plating, brushed or polished stainless, or raw.
  • Color: give the RAL code. RAL Classic uses four-digit codes where the first digit is the color group (7 for greys, 9 for whites and blacks). Add the gloss level and texture separately, and send a physical color sample if the match is critical.
  • Performance: coating thickness, corrosion test or outdoor use requirements, if your market needs them.
  • Marking: logo engraving or stamping, serial numbers, warning labels.

See our powder coating guide for how finish choices affect cost and durability.

4. Quantities, packaging and labeling

Quote quantities as the first order plus estimated annual volume, and break them down by size and color. Pricing for 300 pieces and 3,000 pieces is built differently because tooling and setup are spread over the run. For packaging, state units per carton, carton marks, barcodes or UPC labels, hardware bags, assembly instructions, retail box or bulk, and pallet requirements. Read packaging for export-ready metal products for what to specify.

Checking slot spacing on a steel profile with a tape measure
Checking slot spacing on a steel profile with a tape measure.

5. Commercial terms: Incoterms and target price

Name the Incoterms 2020 rule and the exact place, for example “FOB Hai Phong” or “FCA [named place]”. There are 11 rules:

Transport mode Incoterms 2020 rules
Any mode EXW Ex Works, FCA Free Carrier, CPT Carriage Paid To, CIP Carriage and Insurance Paid To, DAP Delivered at Place, DPU Delivered at Place Unloaded, DDP Delivered Duty Paid
Sea and inland waterway only FAS Free Alongside Ship, FOB Free On Board, CFR Cost and Freight, CIF Cost, Insurance and Freight

Under FOB and CIF, risk passes to the buyer once goods are loaded on board the vessel. For containerized goods, the freight forwarder DSV recommends FCA instead, noting that FOB works best where the seller has direct access to the vessel. Our landed cost guide for Vietnam to US shows how the rule changes your per-unit cost.

Sharing a target price is optional, but it lets the factory suggest material or process changes to meet it instead of simply declining. Also state payment terms you expect and the currency.

Press brake tooling close-up
Press brake tooling close-up.

6. Inspection, samples and timeline

  • Inspection: which dimensions are critical, finish checks, packaging checks, and whether you will use a third-party inspector before shipment.
  • Testing: any load, salt spray or product safety standard your customer requires, and who pays for lab testing.
  • Sample approval: how many samples, what you will check, and that mass production starts only after written approval. Our order flow is drawings or samples, pre-production sample approval, purchase order, then production and shipping. See why prototyping matters.
  • Timeline: quote due date, sample date you need, and target ship or in-warehouse date.

RFQ checklist for custom metal fabrication

Copy this table into your RFQ template and fill one row set per part number.

# Item What to include Done
1 2D drawing PDF, all dimensions, revision, date ☐
2 3D model STEP file; DXF for flat laser parts ☐
3 Material Grade and standard, sheet thickness, tube size and wall ☐
4 Tolerances General class (e.g. ISO 2768-m), welded class (ISO 13920), critical dimensions ☐
5 Finish and color Process, RAL code, gloss, texture, color sample ☐
6 Marking Logo, labels, serial numbers ☐
7 Quantity First order by size and color, annual volume ☐
8 Packaging Units per carton, carton marks, barcodes, pallets ☐
9 Incoterms Rule and named place, Incoterms 2020 ☐
10 Target price Price per unit, currency, payment terms ☐
11 Inspection and testing Critical checks, third-party inspection, test standards ☐
12 Samples Quantity, approval criteria, sign-off ☐
13 Timeline Quote due date, sample date, ship date ☐
Packing line in the factory
Packing line in the factory.

Frequently asked questions

What should be included in an RFQ for metal fabrication?

Include a 2D PDF drawing, a 3D STEP file, material grade and thickness, tolerances, finish and RAL color, quantities and annual volume, packaging, the Incoterms rule, inspection and sample requirements, and your timeline. Missing items force the supplier to assume, which makes quotes hard to compare.

What does ISO 2768-m mean on a drawing?

It means any dimension without its own tolerance follows the medium class of ISO 2768-1, for example ±0.3 mm on sizes over 30 up to 120 mm. Dimensions with their own tolerance on the drawing override it.

Which file format should I send to a metal fabricator?

Send a dimensioned PDF drawing plus a STEP 3D model. Add DXF files for flat laser-cut parts if you have them.

Should I quote FOB or FCA when importing from Vietnam?

FOB is the most common quote from Vietnamese factories and works for sea freight. For containerized goods, forwarders such as DSV recommend FCA, since FOB works best where the seller has direct access to the vessel.

Should I share a target price in my RFQ?

Yes, if you want design-for-cost suggestions. A target price lets the factory propose alternative materials, thicknesses or finishes that meet it.

Request a custom fabrication quote

Send your RFQ and drawings and we will review them and reply with questions or a quote. See how to order for the steps, or contact us directly at kim@haiduongmp.com or +84 988 785 393 (WhatsApp).